Projects / Bathroom renovation / Crosby

COMPLETED PROJECT · Crosby, Merseyside

Bathroom and cloakroom renovation in Crosby.

A main bathroom rebuilt from the floor up, with a walk-in shower, a bath, a double vanity and a custom louvre cupboard, plus a new under-stairs cloakroom.

IMG_6288.jpeg

LOCATION

Crosby,
Merseyside

Project type

Bathroom renovation

Property

End-terrace house

The project

Rebuilt from the floor up, inside and out of sight.

We stripped out both rooms, levelled the bathroom floor and built a new ceiling with a new lighting layout and an extractor on a timer. The walls were boarded, tanked and skimmed, and the floor laid on a decoupling membrane before tiling.

​

Downstairs, we core-drilled for an extractor fan and renewed the pipework for better drainage. This was part of a wider refurbishment of the house. See the property refurbishment.

The scope

What we completed.
bathroom-strip-out.png

Strip-out

Both rooms stripped out back to the structure.

tanking.png

Boarded and tanked

Walls boarded and tanked, with plaster repairs and skimming, sanded and ready to paint.

bespoke-storage.png

Louvre cupboard

Custom-built in marine ply with louvre doors, replacing the old cupboard and housing the boiler.

floor-level.png

Level floor and membrane

Bathroom floor levelled, with a decoupling membrane under the tiles.

large-format-tiles.png

Large-format tiling

Two walls tiled full height and the floor tiled, with tiled skirting elsewhere.

plumbing-waste.png

Cloakroom extraction and drainage

Core-drilled for an extractor fan, with pipework renewed for better drainage.

sockets-lighting.png

Ceiling and lighting

New ceiling structure, new lighting layout, extractor fan with timer and a 2-gang light and extractor switch.

walk-in-shower-panel.png

Bath and shower

D-shaped bath, walk-in shower, concealed-cistern toilet, double vanity and LED mirror.

wall-panelling.png

Cloakroom finish

Floor tiled, fluted wall panelling, a new toilet and corner vanity, and a new window sill.

THE TRANSFORMATION

From a dated bathroom to a spacious family bathroom.
IMG_4962.jpeg
IMG_5538.jpeg
IMG_6289.jpeg

Before

Old bathroom before strip-out

During

Tanked, membrane down, tiling started

After

Shower, bath, vanity and cupboard

A closer look at the finish
IMG_6052.jpeg
IMG_6282.jpeg
IMG_6217.jpeg

Walk-in shower with black fittings and a niche.

Marine ply cupboard with the boiler housed inside.

Cloakroom with fluted panelling and corner vanity.

Project gallery

The result

A spacious bathroom and a smart cloakroom, built to last.

Tanked walls, a decoupled tiled floor and new ventilation behind a walk-in shower, bath, double vanity and custom cupboard.

Planning a bathroom renovation?

Explore our bathroom renovation service and tell us what you would like to change.

More Projects like this
Untitled (52).png

Formby, Merseyside

Untitled (52).png

Formby, Merseyside

IMG_7508.jpeg

Toxteth, Liverpool

Tell us what you have in mind.

Share your ideas and the stage your project is at.

bottom of page