Projects / Bathroom renovation / Crosby
COMPLETED PROJECT · Crosby, Merseyside
Bathroom and cloakroom renovation in Crosby.
A main bathroom rebuilt from the floor up, with a walk-in shower, a bath, a double vanity and a custom louvre cupboard, plus a new under-stairs cloakroom.

LOCATION
Crosby,
Merseyside
Project type
Bathroom renovation
Property
End-terrace house
The project
Rebuilt from the floor up, inside and out of sight.
We stripped out both rooms, levelled the bathroom floor and built a new ceiling with a new lighting layout and an extractor on a timer. The walls were boarded, tanked and skimmed, and the floor laid on a decoupling membrane before tiling.
Downstairs, we core-drilled for an extractor fan and renewed the pipework for better drainage. This was part of a wider refurbishment of the house. See the property refurbishment.
The scope
What we completed.

Strip-out
Both rooms stripped out back to the structure.

Boarded and tanked
Walls boarded and tanked, with plaster repairs and skimming, sanded and ready to paint.

Louvre cupboard
Custom-built in marine ply with louvre doors, replacing the old cupboard and housing the boiler.

Level floor and membrane
Bathroom floor levelled, with a decoupling membrane under the tiles.

Large-format tiling
Two walls tiled full height and the floor tiled, with tiled skirting elsewhere.

Cloakroom extraction and drainage
Core-drilled for an extractor fan, with pipework renewed for better drainage.

Ceiling and lighting
New ceiling structure, new lighting layout, extractor fan with timer and a 2-gang light and extractor switch.

Bath and shower
D-shaped bath, walk-in shower, concealed-cistern toilet, double vanity and LED mirror.

Cloakroom finish
Floor tiled, fluted wall panelling, a new toilet and corner vanity, and a new window sill.
THE TRANSFORMATION
From a dated bathroom to a spacious family bathroom.
Before
Old bathroom before strip-out
During
Tanked, membrane down, tiling started
After
Shower, bath, vanity and cupboard
A closer look at the finish
Walk-in shower with black fittings and a niche.
Marine ply cupboard with the boiler housed inside.
Cloakroom with fluted panelling and corner vanity.
Project gallery
The result
A spacious bathroom and a smart cloakroom, built to last.
Tanked walls, a decoupled tiled floor and new ventilation behind a walk-in shower, bath, double vanity and custom cupboard.