Projects / Kitchen renovation · Aigburth, Liverpool
COMPLETED PROJECT · AIGBURTH, LIVERPOOL
A full kitchen renovation,
right down to the wiring.
A complete kitchen renovation in Aigburth, Liverpool, from strip-out to the last light fitting. Along the way we found and fixed a hidden electrical fault, moved the exposed pipework inside the walls and ceiling, and finished the room with floor and splashback tiles, a tall modern radiator and new lighting.

Location
Aigburth, Liverpool
Project type
Kitchen renovation, part of a wider property refurbishment
Extent of work
Strip-out, plumbing and electrical first fix, concealed pipework, floor tiling, wall and ceiling repairs, new units and appliances, splashback, radiator and lighting
The project
Finding what was hidden, and hiding what shouldn't show.
Once the old kitchen was stripped out, we carried out the plumbing and electrical first fix. In the process we found that a light fitting had suffered a minor short circuit that disconnected an earth wire, a fault that would otherwise have stayed hidden behind the new kitchen, and put it right.
We took most of the exposed pipework running along the kitchen and concealed it inside the walls and ceiling, prepared and tiled the floor, and repaired, skimmed and primer painted the walls and ceiling. The new units went in with every appliance connected, followed by the splashback tiles, a tall modern radiator and two new lights.
This kitchen was part of a wider refurbishment of the property. See the full refurbishment project
The scope
What we completed.

Strip out old kitchen
Old units, worktops and fittings removed back to a clear room.

Floor prep and tiling
The floor prepared, then tiled.

Splashback tiles
A tiled splashback installed above the worktop.

Plumbing and electrics
First fix for both, during which we found a light fitting had shorted and disconnected an earth wire, and put it right.

Walls and ceiling
Repaired, skimmed and primer painted.

Tall modern radiator
A new tall, modern radiator fitted.

Pipework built in
Most of the exposed pipework along the kitchen rerouted inside the walls and ceiling.

Units and appliances
All units fitted and every appliance connected.

New lighting
Two new lights fitted.
THE TRANSFORMATION
From exposed pipes to a finished kitchen in Aigburth
Before
During
After
A closer look at the finish
A slim, upright radiator that suits the new kitchen.
A tiled splashback above the new worktop.
Two new lights fitted to finish the room.
Project gallery
The result
A complete kitchen, with the services built in, not boxed in.
The earth fault is fixed, the pipework now runs inside the walls and ceiling, and the walls, ceiling and floor are repaired and finished. New units and appliances, splashback tiles, a tall modern radiator and new lighting complete a kitchen that's as sound behind the walls as it looks.
Planning a similar Kitchen renovation?
Explore our kitchen renovation service and tell us what you would like to change.