How We Build Bathrooms and Wet Rooms – The Work Behind the Tiles
Most new bathrooms look good on the day they are finished. The difference shows a few years later. Here is how we build ours, from soldered copper pipework to proper wet room floors.
A new bathroom should still look good and work properly years from now. Most of the bathroom problems we see, such as cracked grout, loose tiles, mouldy sealant or a leak through the ceiling below, come from shortcuts in the work you cannot see.
This is how we do it differently.
1. Pipework
We do our own plumbing. Hidden pipework is run in copper with soldered joints, not push-fit plastic, and the whole system is pressure tested before anything is covered up. We explain why in Why We Still Solder: The Case for Copper Over Plastic.
2. Prep work
Tiles are only as good as what they are stuck to. Before any tiling we:
Strip out back to a sound base.
Level and straighten walls and floors where needed.
Reframe where the existing structure is not good enough.
Board wet areas with tile backer boards instead of ordinary plasterboard.
It takes longer than tiling over what is there, but it is the difference between tiles that stay put and tiles that crack or come loose.
3. Shower areas
Tiles and grout are not waterproof on their own. Water gets through, so what matters is what is behind them. Every shower area we build is tanked (a waterproof layer behind the tiles), with extra care at the corners, joints and pipe entries, where leaks usually start.
4. Wet rooms
A wet room is not just a bathroom without a shower tray. The whole floor has to handle water, so every wet room we build has a proper wet room setup:
A floor laid to fall, so water runs to the drain.
A fully tanked floor and lower walls.
A drain that suits the floor build-up.
5. Floors
A bathroom floor takes water, weight and daily use. We make sure the subfloor is solid and stable before any flooring goes down, because movement underneath is what cracks tiles over time. If you are having underfloor heating, it goes in at this stage.
6. Tiling
All our tiling is set plumb and square, with joints lined up across the walls and floor.
7. Grout and sealant
We use top-tier grout and sealant, matched to the colour and style of your tiles. Cheap sealant is usually the first thing to discolour and go mouldy.
8. Electrics
Under building regulations, any new circuit, and electrical work in the area around a bath or shower, has to be notified. Depending on the job, notifiable work is either carried out or checked and certified by our registered electrician partner, so you get the right certificate at the end.
If we find a problem
Once the old bathroom is out, we sometimes find old leaks, rotten timbers or other hidden issues. If we do, we let you know straight away and agree any extra work with you before we carry on.
Planning a bathroom or wet room?
Whether it is a family bathroom, an en suite or a full wet room, we cover Liverpool, Merseyside, Cheshire and Greater Manchester. Call or WhatsApp us on 07919 092991, see our bathroom projects or send us your project details.