top of page

Projects / Property refurbishment / Garston

COMPLETED PROJECT · Garston, L19

Five-bedroom detached house refurbishment in Garston.

An extensive refurbishment, renewing the electrical installation, heating, kitchen and interior finishes.

89fe6987-9203-406a-8f4d-4cbe2e38b406.JPG

LOCATION

Garston, Liverpool, L19

Project type

Property refurbishment

Property
Five-bedroom detached house

The project

From the underlying systems to the final finishes.

Much of the house was taken back to brick. New electrical and heating installations, ground-floor screeding and plastering were combined with a new kitchen, en suite, joinery and decoration.

The scope

What we completed.
asbestos-survey.png

Asbestos survey

Survey as part of the preparatory work.​

​

ground-floor-screeding.png

Ground-floor screeding

Screeding throughout the ground floor.

plastering-and-insulation.png

Plastering and insulation

Plasterboard and plaster throughout; insulation in exposed cavities.

whole-house-painting.png

Whole-house decoration

Painting throughout the house.

strip-out-and-making-good.png

Extensive strip-out

Most areas taken back to brick.

radiator-plumbing.png

Central heating

Unvented cylinder, insulated copper pipe work, pressure testing and designer radiators.

internal-doors-and-joinery.png

Internal joinery

New landing balustrade and French doors from the hallway to the kitchen and living room.

porch-finishes.png

Porch finishes

Tiled floor and PVC ceiling cladding.

electrical-upgrades.png

Complete rewiring

Full rewiring and a new consumer unit.

shower-room.png

Bathrooms and en suite

New main-bathroom en suite; repairs and minor alterations and ventilation upgrade elsewhere.

kitchen-fitting.png

New kitchen

Kitchen installation within the wider refurbishment.

security-and-doorbell.png

Security and doorbell

New alarm, hardwired doorbell and CCTV.

THE TRANSFORMATION

From strip-out to renewed interiors.
IMG_5396.jpeg
IMG_0489.jpeg
IMG_3544.jpeg

Before

Before refurbishment

During

Preparation in progress

After

Refurbished rooms and finishes

A closer look at the finish
IMG_2670.jpeg
IMG_2380.jpeg
IMG_2206.jpeg

The completed kitchen

One of the completed bathrooms

The completed joinery and flooring.

Project gallery

The result

Renewed systems and finishes across a five-bedroom home.

Electrical, heating and interior refurbishment brought together with a new kitchen, en suite, joinery and decoration.

Planning a property refurbishment?

Explore our refurbishment service and tell us about your plans.

More Project like this
Untitled - 2025-12-31T021843.402.jpeg

Maghull, Merseyside

IMG_6604.jpeg

Bootle, Liverpool

83a867c3-758c-4f80-aac1-e9ba7033f776.jpeg

Woolton, Liverpool

Tell us what you have in mind.

Share your ideas and the stage your project is at.

bottom of page